Plan the Satisfactory 1.2 endgame around Tier 9, Project Assembly Phase 5, scalable production, logistics, power margins and modular factories.

Late-game Satisfactory is less about discovering one more machine and more about coordinating the systems you have already built. Tier 9 and the final Project Assembly phase demand advanced components at meaningful scale, so the endgame is primarily a logistics, power and production-planning challenge.
Completing Project Assembly Phase 4 unlocks Tier 9. The current standard Project Assembly requirements for Phase 4 are 500 Assembly Director Systems, 500 Magnetic Field Generators, 250 Thermal Propulsion Rockets and 100 Nuclear Pasta.
The standard Phase 5 delivery requires 1,000 Nuclear Pasta, 1,000 Biochemical Sculptors, 256 AI Expansion Servers and 200 Ballistic Warp Drives. Completing it launches Project Assembly and unlocks the Employee of the Planet Cup in the AWESOME Shop.
For a standard 1× Project Assembly game, the Phase 5 Space Elevator delivery is 1,000 Nuclear Pasta, 1,000 Biochemical Sculptors, 256 AI Expansion Servers and 200 Ballistic Warp Drives. These are the parts you deliver, but they are not necessarily the total upstream production requirement.
For example, the standard Ballistic Warp Drive chain uses Singularity Cells, whose production also consumes Nuclear Pasta. Producing the 1,000 Singularity Cells needed for the 200 Ballistic Warp Drives consumes an additional 100 Nuclear Pasta. This brings the amount of Nuclear Pasta you must produce for the standard Phase 5 set to at least 1,100 in total: 1,000 for direct delivery plus 100 indirectly for the Singularity Cell chain, assuming the standard recipes.
The totals above are for the game's standard 1× delivery multiplier. Other selectable delivery multipliers change the counts, and alternate recipes can change ingredient requirements. Check the actual Space Elevator in your save before building to these numbers.
Sources: Space Elevator: phases, requirements and additional intermediate Project Parts on the official Satisfactory Wiki.
Late-game parts draw from many earlier production chains. Treat established factories as suppliers and move finished or semi-finished products between specialised sites. Trains, drones and high-throughput belts all have roles depending on distance and volume.
Tier 9 production can add large and sometimes variable power demands. Keep a substantial margin between normal factory consumption and available generation. Expand fuel, nuclear or later power infrastructure before a new production block pushes the grid into repeated shutdowns.
Not every Project Part line needs to run forever at maximum output. Build permanent capacity for broadly useful components, then feed Project Assembly production from those systems. Once a phase is complete, machines dedicated only to a finished Project Part can be repurposed.
By late game, repeated machine groups, rail supports, logistics floors and utility modules are better candidates for blueprints than individually placing every component again. Standard modules also make later expansion easier to understand.
Use production rates and machine status to identify the actual limiting component. Increasing every upstream factory because one endgame Manufacturer is starved usually creates excess material, extra power consumption and a much larger debugging problem.
Large saves benefit from consistent railway directions, labelled stations, dedicated production districts and predictable resource routes. The final factory does not need to be one building. A connected industrial world is often easier to scale and troubleshoot.